ALFERDOUS Company has successfully completed numerous large-scale projects for many prestigious clients in different sectors including

 

  • Material Supply according to different standards and Codes (ASTM, ASME, DIN, JIS, etc …)

  • Qualified and Certified Man power supply (Engineers, Inspectors, Supervisors, etc …)

  • Oil, Gas, Petrochemical and Industrial.

  • Power Generation, Substations & Desalination Plants.

  • Sewage Treatment Plants and Pumping Stations.

  • Construction, Installation & Commissioning Projects.

  • Insulation, sand blast and Painting Works.

  • Pipeline Construction.

  • Maintenance of Oil & Gas and Petrochemical Installations.

Our commitment to execute projects with highest quality, on schedule and within budget while adhering to excellent standards of health, safety and environmental positioned ALFERDOUS Company to be recognized as an icon in the construction community in Egypt .
ALFERDOUS Company has invested in its resources to meet international standards and upgraded its fleet of equipment in preparation to participate in upcoming diverse projects.

  • Project Name: ETHYDCO Project
  • Main contractor: Toyo (Japan)
  • Period: 8 months
  • From: November 2014 TO: Now

 

Scope of work

Fabrication and Erection:

  • Fabrication and erection (GRE &FRP) Piping Spools in chemical Area (Caustic and chloride acid Service).

  •  

    Material Supply:

    • Material Supply and erection steam wrapping for steam tracing lines according to Project Specs and Deliver all the works to Ethydco QC Department.

    • Material Supply for (valves, Bolts ,Gaskets and all missing mechanical Parts)

    •  

      Man Power Supply:

      Al Ferdous Data Base contains all categories of required man power with all levels (entry, intermediate& professional) supported with their resumes attached with all the required evidence certification and previous experience and their references.

    • Man power supply in all categories as following :

    • Instrumentation Group (electrical technician, Electrical Helper ,Calibration technician, Loop check & Function Check Technician, Supervisor ,Engineer and coordinator)

      Electrical Group ( Cable tray Technician, Electrical Power Helper, Tube Fitter and supervisor)

      Commissioning Group (Hydrostatic expediting group consist of technicians ,helpers ,grinder ,welder ,supervisor and engineer) making meeting with J.V engineer and make the limits for the hydrostatic circuit and work to check the circuit and make it ready on hydro test time according to schedule.

      Chemical Cleaning Group (Technicians ,Helpers and engineer) specialized in chemical cleaning for the piping system according to J.V Meeting and procedure

      Punch List Group : to close all the pending punch items category A to release hydro test and category B and c after hydro test

      Insulation group (aluminum fitter, rock wool technician , helpers ) to expedite the insulation scope

      Security Group (Security man power ) work under supervision from J.V security Manger

      Housekeeping Man power : to expedite the cleaning of different areas in ethylene area

      Technical Office support : provide the appropriate procedures for painting ,welding , material selection I details in our technical proposal.

    • Man Power Certification & Qualification:

    • All the welders are qualified and certified according to AWSD1.1 or/and ASME IX and have experience in pressure part welding.

      All the QC Engineer has certification according to their area of concern CWI/CSWIP for welding API 570/510/653 for piping/Vessels/Tanks and CSWIP B.GAS for Painting

    Click here to view the project’s photo gallery.

    • Project Name: Middle East Oil Refinery Company (MIDOR)
    • Period: 3 years
    • From: April 1998 TO: May 2001

     

    Scope of work

    • Fabrication and erection Piping system and pipe lines

    • Fabrication and installation Steel structure according to AISC.

    • Supply and erection the insulation material (thermal and acoustic) including all insulation accessories according to client specs and procedure.

    • Making all the paining and coating according to client specs and procedure.

    • making all the sand blast works

    • Fabrication and erection tanks.

    • Man Power Supply

    1. Qualified and certified welders (pipe and plates)
    2. Supervisor, forman, fitters, inspectors and helpers.

    Click here to view the project’s photo gallery.

    • Project Name: Egyptian Linear Alkyl Benzene Company (ELAB)
    • Period: 2 Years
    • From: January 2008 TO: 2010

     

    Scope of work

    • Fabrication and erection piping systems and pipe lines and hangers.

    • Fabrication and installation supports.

    • Supply and erection the insulation material (thermal and acoustic) including all insulation accessories.

    • Making all the paining and coating according to client specs and procedure.

    • Man Power Supply

    1. qualified and certified welders (pipe and plates)
    2. Supervisor, Forman, fitters, inspectors and helpers.

    Click here to view the project’s photo gallery.

    • Project Name: Mopco Project. (Domaitt)
    • Period: 6 months
    • From: June 2011 TO: December 2011

     

    Scope of work

    • Fabrication and erection pipe lines (duplex Material) Including Fire Fighting Network.

    • Fabrication and installation supports.

    • Supply and erection the insulation material (thermal and acoustic) including all insulation accessories.

    • Making all the paining and coating according to client specs and procedure.

    • Man Power Supply

    1. Qualified and certified welders (pipe and plates)
    2. Supervisor, forman, fitters, inspectors and helpers.

    Click here to view the project’s photo gallery.

    • Project Name: Alexandria National Refine Petrochemical company (ANRPC) ALFERDOUS
    • Period: 3 years
    • From: March 2002 TO: May 2005

     

    Scope of work

    • Erection steel structure bridge according to assembly drawings.

    • Making all the Maintenance works including:

    • Thermal equipment’s.

    • Stationary equipment’s.

    • Rotary equipment’s.

    • Tanks and pressure vessels.

    •  

    Click here to view the project’s photo gallery.

    • Project Name: Egyptian Refinery Company (ERC)
    • Main Contractor: GS (Korea).
    • Period: In Progress.
    • From: November, 2016 TO: Now

     

    Scope of work

      Material Supply:

      • Material Supply and erection temporary lines and fixtures for the piping system hydrostatic test.
      • Material Supply for (valves, Bolts, Gaskets and all missing mechanical Parts).

       

      Hydrostatic Test Packages:

    • Al ferdous Engineers with GS engineers was responsible for checking the limits for the hydrostatic circuit according to approved drawings and check the circuit

    • Alferdous engineers was responsible for making last walk down on the circuits to check the precautions (Flow meter, orifice, check valves ,……) and make it ready on hydro test time according to schedule.

    • Al ferdous was responsible for making hydrostat for the different piping circuits at different pressure test using calibrated pressure gauges and calibrated PRV according to (GS-ERC/ACISC) hydro test procedure (As per Annex A)

    •  

      Main Power Supply:

    • Al ferdous Data Base contains all categories of required man power with all levels (entry, intermediate& professional) supported with their resumes attached with all the required evidence certification and previous experience and their references.

    • Man power supply in all categories as following

    • Commissioning& Pre-Commissioning Group (Commissioning & Precommissioning expediting group consist of various discipline technicians ,helpers ,grinder ,welder ,supervisor and engineers)

    • Boxing up Group (Technicians, Helpers and engineer) specialized in list all the items in the boxing up for the different assets in the site.

    • Punch List Group: to close all the pending punch items category A to release hydro test and category B and c after hydro test.

    • Insulation group (aluminum fitter, rock wool technician, helpers) to expedite the insulation progress.

    • Technical Office support: provide the appropriate procedures for painting, welding, material selection I details in our technical proposal.

    •  

      Main Power Supply:

      All the welders are qualified and certified according to AWSD1.1 or/and ASME IX and have experience in pressure part welding All the QC Engineer has certification according to their area of concern CWI/CSWIP for welding API 570/510/653 for piping/Vessels/Tanks and CSWIP B.GAS for Painting.

       

    Click here to view the project’s photo gallery.

    • Project Name: GIECO
    • Main Contractor: Cargill (USA)
    • Period: 1 Year.
    • From: November, 2016 TO: December, 2017

     

    Scope of work

      Fabrication and Erection:

      • Fabrication and erection piping systems according to the factory P&ID and project specs

      • Material Supply:

        Al Ferrous Data Base contains all categories of required man power with all levels (entry, intermediate& professional) supported with their resumes attached with all the required evidence certification and previous experience and their references

         

        Welders: ACISC provide the project with different qualification levels of the welders (plates and piping) according to project needs and ASME IX qualification code.

         

        Safety: (group consist of safety officers ,flag man ,safety manger ,safety supervisor and engineer) making meeting with Cargill and make the rules and risk assessment for every type of work at the site according to schedule.

         

        Technical Office support: provide the appropriate procedures for painting ,welding , material selection I details in our technical proposal

         

        Man Power Certification &Qualification:

        All the welders are qualified and certified according to AWSD1.1 or/and ASME IX and have experience in pressure part welding All the QC Engineer has certification according to their area of concern CWI/CSWIP for welding API 570/510/653 for piping/Vessels/Tanks and CSWIP B.GAS for Painting

         

         

        Security Group (Security man power ) work under supervision from J.V security Manger

        Housekeeping Man power : to expedite the cleaning of different areas in ethylene area

        Technical Office support : provide the appropriate procedures for painting ,welding , material selection I details in our technical proposal.

         

        Man Power Certification & Qualification:

        All the welders are qualified and certified according to AWSD1.1 or/and ASME IX and have experience in pressure part welding.

        All the QC Engineer has certification according to their area of concern CWI/CSWIP for welding API 570/510/653 for piping/Vessels/Tanks and CSWIP B.GAS for Painting

      Click here to view the project’s photo gallery.

      • Project Name: OBEGI for Chemical Industries &Polymers SAE.
      • Main Contractor: PSC & Engineering Egyptian Company
      • Period: 8 months
      • From: March, 2016 TO: Janury, 2017

       

        Scope of work

        12 Processing Storage Tanks (5 Tanks, Diameter 7.16 Meter & 7 Tanks, Diameter 4.29Meter) Plus 2 Small Fuel Tanks

        Material Supply,Fabrication,Erection &Painting 

        • Fabrication and erection 14 Tanks with different diameters.

        • Responsible for Supply the sand for sand blasting and will be responsible for accomplish the sand blasting process and painting process according to the specs

        • Responsible for Supply the Raw Material as mentioned in the approval drawing attached with the MTC and Nozzles and painting Material system including the Manufacturer painting application guide

        • Responsible for Fabrication (Cutting, Rolling, Fitting, Welding & Nozzle Erection) concerning the small diameter Tanks In our Work Shop for (7 Tanks * 4.29 Meter Diameter).

        • Responsible for supply all the required Process Consumables (Electrodes) & Qualified and certified man power supply to accomplish the works with in your planned schedule.

        • Responsible for supply all the electricity Sources and water sources in our workshop.

        • All the data for the executed tanks at the site as shown in below.

        •  

          Man Power Certification &Qualification:

          All the welders are qualified and certified according to AWSD1.1 or/and ASME IX and have experience in pressure part welding All the QC Engineer has certification according to their area of concern CWI/CSWIP for welding API 570/510/653 for piping/Vessels/Tanks and CSWIP B.GAS for Painting

           

          Security Group (Security man power ) work under supervision from J.V security Manger

          Housekeeping Man power : to expedite the cleaning of different areas in ethylene area

          Technical Office support : provide the appropriate procedures for painting ,welding , material selection I details in our technical proposal.

          Man Power Certification & Qualification:

          All the welders are qualified and certified according to AWSD1.1 or/and ASME IX and have experience in pressure part welding.

          All the QC Engineer has certification according to their area of concern CWI/CSWIP for welding API 570/510/653 for piping/Vessels/Tanks and CSWIP B.GAS for Painting

        Click here to view the projects photo gallery.

        • Project Name: Liquefied Natural Gas Company (LNG) Piping supports
        • Main Contractor: LNG
        • Period: 6 months
        • From: November, 2016 TO: May, 2017

           

          Scope of work

          Special supports fabrication 

          • Material supply, fabrication and erection of large bore pipe lines special supports (24 inch)

          • Fabrication procedure including :

          • a- Cutting the plates according to required dimensions.

            b- Machining the plates according to approved drawing.

            c- Welding the various parts of the support using approved WPS throughout certified welder according to ASME IX.

            d- Perform appropriate NDT according to ITP (PT/MT) according to ACISC.

          Click here to view the projects photo gallery.

          • Project Name: Warehouse transportation and management
          • Main Contractor: Rashpetco Co
          • Period: 6 months
          • From: April, 2017 TO: Oct, 2017

             

            Scope of work

            Warehouse transportation & management. 

            • Making schedule plan according to the owner requirements concerning the transportation warehouse equipment.
            • Making risk assessment for every category of equipment according to safety rules and its criticality.
            • Making sorting system for the transporting equipment during the transportation to prevent any loss or mixing up.
            • Provide package, labeling, transportation, lifting, and handling and reservation procedure to be approved from the client before commencement the project.
            • Provide safety, risk assessment, risk matrix to be approved from the client before commencement the project.
            • Provide weekly progress with the progress and compare it with the planned
            • Making corrective solutions to speed up the progress (increase man power, making multi shift and/or reschedule the project plan).

             

          Click here to view the projects photo gallery.

          • Project Name: Unit-14
          • Main Contractor: PTJ (Petrojet)
          • Owner: APRC (Amerya Petroleum Refining Company).
          • Period: 1 Year
          • From: March, 2016 TO: March, 2017

             

            Scope of work

            Man Power Supply 

            Al ferdous Data Base contains all categories of required man power with all levels (entry, intermediate& professional) supported with their resumes attached with all the required evidence certification and previous experience and their references.

            Man Power Supply in all categories as following:

            • Welders
            • Grinding technician.
            • Helpers.
            • Safety officers.
            • Site engineers

             

            Man Power Certification &Qualification

            All the welders are qualified and certified according to AWSD1.1 or/and ASME IX and have experience in pressure part welding All the QC Engineer has certification according to their area of concern CWI/CSWIP for welding API 570/510/653 for piping/Vessels/Tanks and CSWIP B.GAS for Painting.

          Click here to view the projects photo gallery.

          • Project Name: WND (West Nile Delta Project)
          • Main Contractor: BECHTEL
          • Period: 1 Year
          • From: December, 2016 TO: December, 2017

             

            Scope of work

            Man Power Supply 

            Al ferdous Data Base contains all categories of required man power with all levels (entry, intermediate& professional) supported with their resumes attached with all the required evidence certification and previous experience and their references.

            Man Power Supply in all categories as following:

            • Welders
            • Grinding technician.
            • Helpers.
            • Safety officers.
            • Site engineers

            Man Power Certification &Qualification

            All the welders are qualified and certified according to AWSD1.1 or/and ASME IX and have experience in pressure part welding All the QC Engineer has certification according to their area of concern CWI/CSWIP for welding API 570/510/653 for piping/Vessels/Tanks and CSWIP B.GAS for Painting.

          Click here to view the projects photo gallery.

          • Project Name: Alexandria Mineral Oils Company (AMOC)
          • Period: 2 Years
          • From: August, 1998 TO: August, 2002

             

            Scope of work

            • Fabrication and erection piping systems and pipe lines and hangers.
            • Fabrication and installation supports.
            • Supply and erection the insulation material (thermal and acoustic) including all insulation accessories
            • Making all the paining and coating according to client specs and procedure (TR & Foster wheeler).

          Click here to view the project’s photo gallery.

          • Project Name: EL-Wattania for Fertilizers
          • Period: 1.5 Year
          • From: January, 2006 TO: August, 2007

            Scope of work:

            • Fabrication and erection piping system for boiler (super heater walls) including welding special materials 1.25 Cr, 0.5 Mo.
            • Fabrication and installation Steel structure according to AISC.
            • Supply and erection the insulation material (thermal and acoustic) including all insulation accessories according to client specs and procedure
            • Making all the paining and coating according to client specs and procedure.

             

            Man Power Supply:

            • Qualified and certified welders (pipe and plates)
            • Supervisor, Forman, Fitters, Inspectors and Helpers..

             

          Click here to view the project’s photo gallery.

          • Project Name: Burullus, Cross Over Project.
          • Owner/Client: Burullus Gas Company
          • Main contractor: ENPPI
          • Period: 20 Days
          • From: 1st March, 2014 TO: 25th March, 2014

            Scope of work:

            Fabrication, Fit up, erection & Welding Activities of Split Tee for the following:

            • One Unequal Tee Carbon steel
              – Material : ASTM A234
              – Size: 36″X 30″
            • Two Tee Carbon steel
              – Material : ASTM A234
              – Size: 24″
            • Two Unequal Tee stainless steel
              – Material : ASTM A403
              – Size: 24″X 10″
            • Making all the welding activities according to client specs and codes.
            • All welders are certified and qualified with in required positions and material type and thickness
            • All the works had been done under supervision from qualified inspectors and QA/QC Engineer (all the staff approved from main contractor before start the working activities)

          Click here to view the projects photo gallery.